diebauplaner Industrieanlage Lenzing

Industrial plant engineering Lenzing

Projekt

Erection of a steel frame tower as a spatial supporting steel structure (filmtruder) on a newly erected reinforced concrete building
Design, dimensioning and construction sketches of the connections of the steel structure (in total about 1,000 tons) Review of the workshop plans of the executing company. Drawing up control and inspection plans and random inspection and acceptance of the construction on site.

2013

Principal

Zeman & Co GmbH

Building Owner

Lenzing Aktiengesellschaft