diebauplaner Drehscheibe Mürzzuschlag

Turntable Mürzzuschlag / Styria

Project

Bridge inspection of the 20m long locomotive turntable built in 1905.
Dimensioning of the existing structure. Design of renovation measures.
2021 bis 2022

Principal/Owner

DI Dr. Vill ZT GmbH und ÖBB Infrastruktur AG